Embeds, blockouts and sleeves

Embeds, blockouts and sleeves, placed on the drawing.

Exact Layout places anchor bolts, embeds, blockouts and sleeves on the job's drawings, floor by floor, so the crew sees each one where it belongs before the pour.

Placed on the drawing

Every embed, blockout and sleeve where it belongs.

Embeds, blockouts and sleeves are small, easy to miss and expensive to fix once the concrete is in. Exact Layout places them on the job's drawings, floor by floor, so the crew sees each one on the sheet they are standing on, with the dimensions they need.

  • Anchor bolts, plates and embeds
  • Rail and opening blockouts
  • MEP sleeves over the structure
EXACT LAYOUT Field
A floor in the Field app with its layers panel: control points, architectural and structural layers
What is covered

The small items that cause big rework.

  • Anchor bolts and embeds

    Placed on the drawing where they belong, with their dimensions, so the crew sets them right the first time.

  • Blockouts

    Blockouts for rails, openings and equipment, placed and dimensioned on the floor they belong to.

  • Sleeves

    Sleeve layouts from the trade drawings, shown over the structure, so a sleeve that lands in a beam shows up before the pour.

  • Control lines

    The lines the crew measures from, set on the drawing.

  • Layers

    Show only what the crew needs to see: just the embeds, just the sleeves, or everything at once.

  • Feet and inches

    Measured right on the drawing, the way the crew reads a tape.

Trades over structure

Sleeves and openings checked against the slab.

MEP trades issue their own sleeve and penetration drawings. Laid over the structural drawing, a sleeve that lands in a beam, a column or a post-tension band shows up on the drawing instead of on the deck.

Questions go back to the trade and the design team early, while there is still time to move a sleeve.

Who it is for

Concrete crews, trades and the office behind them.

Concrete and post-tension crews use it to set embeds and blockouts before the pour. MEP subcontractors use it to see their sleeves against the structure. Project managers and engineers use it to settle questions before they reach the field.

In person from Tampa to Miami.

Common questions

Straight answers.

Which items can be placed?

Anchor bolts, embeds and plates, rail and opening blockouts, sleeves, and control lines, on the floor they belong to.

Do you set the embeds on site?

No. Exact Layout places them on the drawing. Your crew sets them, working from your surveyor's control.

Can we see only the sleeves, or only the embeds?

Yes. Layers let the crew show only what they need on the deck.

What if a trade revises its sleeve drawing?

The new revision goes on the job and can be laid over the structure again.